Recently major work record (2008 - 2018)

Date

Project

Service of the project

Client

2008

IBC2008

 Dispatch sound engineer for SHV system.

-

2009

National science museum

Planetarium Daejeon Korea

 Field support service for installation. 

 Special made equipment for sound system.

 

-

2010

 Chinese science technology museum

 Supervise for installation.

 Translation work for installation.

-

2010

India Guwahati Planetarium

 Special made equipment for sound system.

 Supervise for installation.

 Translation work for installation.

-

2011

India Ujjain Planetarium

 Special made equipment for sound system

-

2012

Dominican Republic

 "Auditoria Enriquillo Sanchez  "

 Special made equipment.

 Supervise for Installation work.

 Operation training at project site..

-

2013

Uzbekistan 

 Local site project management work

- 

2014

Bangladesh

 "Novo Theatre Planetarium" 

 Special made equipment for sound system.

- 

2015

Trial production
"5m Dome screen"

 Special made product design Work

- 

2016

Philippines
"National Museum Planetarium"

  Supervise for Installation work.

  Operation training at project site..

- 

2017

Arab Republic of Egypt
"Navy College Planetarium"

  Special made equipment.

 Supervise for Installation work

- 

2018

Anjo city, Aichi pref Japan
"Planetarium"

  Special made Lighting product.

 Supervise for Installation work.

- 

-

Making out technical documents 

for various tender.

 -

-

-

Various maintenance service

for existing sound system.

 -

-

-

Special made Loud Speaker.

for Planetarium sound system.

-